Dredging in the water area of the Bolshoy Kamen Bay will allow the Zvezda Shipbuilding Complex to organize an access channel and provide the necessary depth at hydraulic structures: berths, embankments, pier and drydock. The current depth of the bay ranges from 6 to 7 meters, and after
dredging it will be from 12 to 30 meters. The carried out work will allow to build and launch ships without restrictions on their tonnage and draft.
Transport-transfer dock is designed to carry out work on launching large vessels with a length of 300 meters and a width of more than 50 meters with a launch weight of up to
40,000 tons, as well as objects of marine technology, drilling platforms and their structures, in particular.
After towing, floating dock lied out in the Ussuri Bay and in 3 hours was delivered directly to the water area of the shipbuilding complex. The floating dock is moored at a regular workplace at a heavy open-air shipyard berth.
tel./fax: +7 (423) 239-29-09
mob.: +7 (914) 718-04-28
skype: live: a8a664b9311ba761
wechat ID: S-Smirnov
mail to: agent@sdsshipping.ru